This new contemporary dwelling in Welford on Avon is carrying on sucessfully with the building team working in separate rooms and outside in the spring air. The scaffolding was dropped just before the lockdown and the site has been managed well to allow activity to continue inside so long as materials are avaliable on-site. Completion is due soon for a summer occupation.